Explore future solar utility with GRO
Register a non-binding Solar Interest Request, compare provisional kits and review country support while GRO prepares future Phase 3 partner opportunities.
GRO Solar Interest Hub
Complete the existing request, review provisional system examples and check available country information from one page.
GRO Solar Interest Request — Phase 3 Preview
GRO Solar Interest Request
GRO is currently in Phase 2. This Solar Interest Request is a preparation step for Phase 3. Submit a non-binding request to help GRO identify where solar demand is strongest and prepare future partner offers by country.
Kits Preview
Review the provisional kit examples below before submitting your request. These examples help estimate what kind of solar system may fit your needs.
Kit A
Balcony / Plug-in Micro-PV (0.8–1.6 kW)
Pilot market
Balcony / Plug-in Micro-PV (0.8–1.6 kW)
Ideal for: Renters / condos; easy DIY
- 2–4 × 400–430 W panels
- 1 microinverter 600–1600 W
- Balcony / wall mounts
- Smart plug meter
≈ CAD $900–$2,400 hardware-only
Subsidy tip: Grid-tied rules vary; check local allowance for plug-in vs. hard-wired.
Kit B
Off-Grid Cabin Starter (0.8–2.4 kW + 1–5 kWh)
Limited
Off-Grid Cabin Starter (0.8–2.4 kW + 1–5 kWh)
Ideal for: Cabins, vans; no grid needed
- 2–6 × 400 W panels
- MPPT charge controller
- 1–5 kWh LiFePO4 battery
- Off-grid inverter
- Racking & wiring
≈ CAD $2,000–$6,500 hardware-only
Subsidy tip: Usually not subsidized; check rural schemes.
Kit C
Grid-Tied Home Core (5 kW + Microinverters)
Likely available
Grid-Tied Home Core (5 kW + Microinverters)
Ideal for: Single-family homes; scalable
- 12–14 × 400–430 W panels
- 5 kW total microinverters
- Rapid shutdown
- Roof racking
- Monitoring gateway
≈ CAD $8,500–$12,500 hardware-only (turnkey $16k–$24k)
Subsidy tip: Ensure CSA / UL / IEEE 1547 compliance and utility interconnection.
Kit D
Grid-Tied + Storage (5 kW + 10 kWh)
Installer dependent
Grid-Tied + Storage (5 kW + 10 kWh)
Ideal for: Outage resilience; time-of-use shifting
- Kit C + 10 kWh LiFePO4
- Hybrid inverter or AC-coupled interface
≈ CAD $15,000–$23,000 hardware-only
Subsidy tip: Storage support depends on local rules; some markets support batteries explicitly.
Kit E
Solar Hot Water (Flat-plate, 2 panels)
Limited
Solar Hot Water (Flat-plate, 2 panels)
Ideal for: DHW preheat to cut gas / electric use
- 2 flat-plate collectors
- Pump station & controller
- 200–300 L dual-coil tank
- Glycol & roof mount
≈ CAD $3,000–$5,000 hardware-only (installed $6k–$9k)
Subsidy tip: Some countries support thermal systems under different energy-efficiency programs.
Kit F
EV-Ready Bundle (5–7.5 kW + 40 A EVSE)
Compliance required
EV-Ready Bundle (5–7.5 kW + 40 A EVSE)
Ideal for: Households adding an EV
- 5–7.5 kW PV (as Kit C)
- 40 A Level-2 EVSE (smart)
≈ CAD $9,500–$15,000 hardware-only
Subsidy tip: EV charger support may come from separate utility / state / province programs.
Country Support & Incentives
Select your country to view official incentive programs, export / net-metering paths, and key eligibility notes. Final availability depends on local rules, utility approval, product compliance, and installer requirements.
Tip: type a few letters to quickly find your country, then check official support programs.
A preparation request, not a purchase or reservation
Submitting interest does not lock, spend, burn or reserve GRO. Future availability depends on partners, location, eligibility and Phase 3 decisions.